Power section: Fitted inside
Number of axes: One
Optional Module: CCD compliant with IEEE 802.3 standards
Cross Communication: Functions as master
Operating location: Only inside drive controller housing
Storage: In conductive packaging
Operating Precaution: Not to be operated underwater
Installation: in upright orientation
National Regulations: Machine must adhere to before commissioning
Grounding: Required before operation
Connectors: Cannot be plugged in or removed when on
Monitoring Functions: Integrated into components
Cool down time: 15 minutes post power off
Transport and mounting: Suitable equipment necessary
Transportation: By reputed freight carriers